FAQ Questions frequent

TERMS & CONDITIONS

• V.A.T. not included

• Valid until: 1 week

• Delivery Terms (Incoterms 2010): EX WORKS (our factory)

• Payment terms:

B/ 100% Prepayment

C/ 50% Prepayment ­ 50% L/C

Unless otherwise stated, this quote does not include:

• Work management and assistance at the jobsite.

• Transportation costs.

• Profiles and structural fixing systems for the products (to be defined according

to the project).

• Special packaging for particular transportation

• Installation of materials.

• Structural design and calculus.

• Execution of the electrical design.

• Supply of electrical wiring for interconnection between units.

• Permits, authorizations and/or other certifications.

• Packaging recycling

• All any other item not stated in this quote.

This quote has been calculated based on the information and drawings provided.

Should the items quoted in this document change in nature, size, quantities,

and/or result modified after the quote is calculated, such quote may vary too.